摘要

110 kV清溪土桥变电站是东莞输变电工程的一部分。从电网的现状及发展趋势和经济发展的角度系统地阐述了在清溪镇建设变电站的必要性,从技术上和经济上分析了建设变电站的可行性。研究了变电站的落点,并提出了变电站与原有110 kV电网的接入系统方案。

Abstract

Research on Point of Fall and Connection System for 110kV Transformer Substation in Tuqiao Village Qingxi TownSUN Cheng-fang1,XIAO Li-min2,CHEN Ling-da3,XIAO Li-sha1,PENG Shao-min4(1.City College,Dongguan University,Dongguan 523106,China;2.Power Design Inst.of Dongguan,Dongguan 523009,China;3.Taizhou Luqiao District Engineering Quality Supervising Municipal,Taizhou 318050,China;4.School of Civil Engineering and Architecture,Wuhan University of Technology,Wuhan 430070,China)Transformer substation of 110 kV Power in Tuqiao village Qingxi town is one part of Dongguan transmission and transforming engineering.The necessity and feasibility of transformer substation which lie in Qingxi town is narrowed systematically from a Point of View of the Current Status and trends of electric power network and economy developing,and he feasibility is analyzed from a Point of View of technology and economy.The point of fall of transformer substation is researched,and the connection system with 110kV north electric power network is brought forward.transformer substation;necessity;feasibility;point of fall;connection system

引用本文

导出引用
孙成访 . 东莞110kV清溪土桥变电站落点及接入系统研究 . 武汉理工大学学报. 2007, 29(S2): 63-66

参考文献

73

Accesses

0

Citation

Detail

段落导航
相关文章

/